Planned operations: Stage 1 - Passenger only Signal / Speed system on Regional lines are regular AŽD (Czechoslovak - due to their unlimited options of programming and simplicity, and my lack of knowledge of German signals) signals and speed signs (unless LZB wire is present, in which case driving with HUD is required).
Signal / Speed system on HS lines is created to be as close to PZB and LZB as possible with current available assets. Route lenght and path is fictional, real are only names. Route planning will be done via polls if this project gains enough attention. I will be posting updates, polls and various screenshots from the development here.
This thread is for my fictional high-speed project.